OK, you've completed your site review, outline design is over, and you're ready to start designing your basics. Here's what you need to know.

There are five main types of fundamentally low-rise buildings, within which households fall. What type of land is built determines the type of foundation to use.

Basics and Operation

· Charging the Trench

· Strip foundation

· Wide Strip Foundation

· Raft Foundation

· Piled Foundation

An important note. When you unload the dungeon, you need to gain control of the buildings, the NHBC or an independent structural engineer to examine the ground before pouring the bases. Disregarding this means getting your bases as the worst case, especially when the soil is not suitable for the type of foundation you intend to pour.

It's safe to do the checks

Trench Fill

] Filling the ditch is a technique used by deep bases to fill ditches. What's going on, going to the scene and digging your bases, but about 1600 or maybe even 2,000 mm under the ground. Obviously, you do not want to fill this depth in full depth, so you order a weak mix of concrete from your finished mix company and fill it in the ditch until you reach the depth on which your bases are proposed for concrete. Tunnel filling is just as powerful as a good carrier to provide a good foundation for the base of the strip.

Strip Foundation

The base of the strip is the simplest house foundation. This is a Gen 1 grade concrete with a width of 650 m wide and generally up to 350 mm, with reinforced steel to the upper or lower part of the base or occasionally to both. It is preferable for engineers to plan the foundation for you and give you the size before starting. The base of the strip is replaced with a wide strip base and now supports the inner walls of the house.

Wide Striped Stones

Wide Streaks are Similar to Standard Stripes, Unless Wider. They are wider to spread the space over the ground. Wider strips are usually used in worse soil conditions. The base strips are generally 1 m wide x 450 mm deep, reinforced steel or upper or lower part of the foundation or sometimes both, although the engineer may determine other dimensions depending on the soil conditions and the load applied to the foundation

Raft Foundations

Basically, this is a concrete slab concrete that is placed under the steel reinforced concrete slab on the base of the house. While the raft foundation is still in use, it is slowly leaving fashion as shipwreck tends to lie in very bad soil conditions.

Good quality areas are scarce, the weak unpaved soils are currently being built. Weak or liquid soils or soils containing large amounts of compressible elements are of primary importance to piles. Pile is simply a square-length concrete through which four ironed steel rods run through.

The pile is generally 350 mm depending on the engineer and can be of any length from 4m to 12m. The engineer determines the number of piles needed to support the house and where to place them. This is usually within in-house nodes and intersections. They stumble as long as they are not instructed. So they will not go any further.

After the piles were driven on the vertexes, they were slaughtered and all they had to do was stick to the beams. A mud or 50 mm concrete layer is then placed on site. Then the line of the house is marked, as well as all the internal load-bearing walls. Then, on each side of the piles, a small support wall is built in order to create a trench within which the bases can be cast.

After the blockade is completed, reinforced concrete is poured into the concrete site and engineers plan to plan and combine to form a steel cage that forms the foundation of the foundations. These are on top of the piles. Once the steel was installed, fitted and tied, the concrete was poured in the same way as a ribbon or a wide ribbon base. The concrete is mixed with poker to remove any excess air bubbles from the primer.

All you have to do is wait for the concrete to solidify and start building your house. Generally, pre-stressed floor tiles are used for accumu- lated foundation. This is a very safe and fast method for building.